Expert and geotechnical supervision of the works on the construction and equipping of the right tunnel tubes of the Tuhobić tunnel, the Vrata tunnel and the Hreljin tunnel was carried out.
Works on stabilizing the vault of the speleological facility in the Vrata tunnel were also supervised.