
Cascade – Landscaping the Mouth of the Miljašić Jaruga
Due to neglect and overgrowth, the channel of the Miljašić Jaruga poses a significant risk to safe water flow, thereby increasing the likelihood of flooding. There is a high probability

Due to neglect and overgrowth, the channel of the Miljašić Jaruga poses a significant risk to safe water flow, thereby increasing the likelihood of flooding. There is a high probability

The Kalanjevac retention basin is located in Sisak-Moslavina County, near the municipality of Topusko. Its purpose is to provide flood protection for the area downstream of Topusko. The lowest elevation

Preliminary, main, and detailed designs have been prepared for the following facilities: Razbojište Reservoir Ribnjak Reservoir Pond landscaping/development Central anglers’ building Competition course, bridges, and piers Sanitary facilities, picnic shelter,

The Vonarje Dam on the Sutla River, located upstream of the Mestinjščica confluence, was built in 1980. As part of the dam’s modernization, civil engineering, electrical-mechanical, and geodetic designs were

Geotechnical investigations were conducted and a design for the shoring of an excavation pit up to 12 m deep was prepared for the construction of an underground garage at the

The conceptual, detailed, and execution-level geotechnical design for the City of Sisak Wastewater Treatment Plant comprises: 1) construction of surface drainage channels, 2) execution of 6 open-cut excavation pits, 3)

The preliminary and detailed geotechnical design for the reconstruction and expansion of the “Ivanja Reka” interchange comprises: 1) the reconstruction and expansion of the “Ivanja Reka” interchange, 2) the construction

The project for the improvement of non-building flood risk management measures in the Republic of Croatia – VEPAR has set the goal of achieving additional value by improving the technical