References

Construction of the Wastewater Treatment Plant for the City of Sisak

The conceptual, detailed, and execution-level geotechnical design for the City of Sisak Wastewater Treatment Plant comprises:

1) construction of surface drainage channels,

2) execution of 6 open-cut excavation pits,

3) construction of 18 wastewater treatment plant structures,

4) construction of flood protection embankments.

 

The detailed design includes the following calculations: bearing capacity and stability analyses; consolidation and settlement analyses for all structures and embankments; uplift stability analyses for all structures; and bearing capacity calculations for tension piles to ensure uplift stability.